Case Study
Monday, March 23
11:00 AM - 11:25 AM
Live in Everett
Less Details
This session delves into Preventative Maintenance Optimization (PMO) methodologies, focusing on effective implementation, the benefits offered, and the importance of risk assessment. The goal is to enhance equipment reliability, reduce downtime, and achieve significant cost savings. Ultimately, participants will gain insights and lessons learned from a successful case study, highlighting tangible benefits and improvements achieved. In this session, you will learn more about how to:
An electrical engineer with over 23 years’ experience in engineering areas such as Asset Life Cycle Management (ALCM), Project/Portfolio Management and Facilities Management. Knowledge in pharmaceutical site constructions and site decommissioning. Additional background in Health, Safety and Environment (HSE) activities.